Turkmenistan Iron And Steel Factory

Turkmenistan Iron And Steel Factory

Explanation

This facility, which was established on a 150.000m² land 25km from the city of Ashgabat, was realized as a consortium with the Erdemir group. The facility has a total closed area of 45.000m², a green area of 50.000m² and a road and square of 54.000m². Various sizes of rebar and profiles will be produced from scrap iron at the facility. The facility, with a capacity of 160,000 tons/year, has 1 electric arc furnace and 2 rolling mill furnaces. In the facility; A total of 25.640m3 of concrete and 2.250 tons of construction were used.