Central Building of Turkmenistan National Statistical Institute
Explanation
PROJECT DETAILS The front of the building which is on a very important street of Ashgabat was covered with 3.700m2 white marble and granite. All Windows were renewed with double glasses and PVC joinery. The environment of the building and the pavement were covered with 950m2 artificial pavement stone. Decorative lightning elements were used for environment arrangement. The roof of the building was completely renewed. The main entrances were newly organized and a spectacular atmosphere was created in the entrance. Lastly, conference hall for 150 people which is at the second floor of the building was renewed and decorated.
Our projects
Our projects