THE BRIDGE OF AVAZA FREE TOURISM REGION OF TURKMENBASI CITY- ROAD PROJECT
Explanation
The bridge which is at the size of 50 meter width, 30 meter amplitude and lies on the stream of President Manor road of Avaza Region was decoratively covered with first quality materials, marbles of modern architecture views, granite, fibro concrete materials. It was resolved with space system metal construction and concrete transporter pole system. There are statues of Turkmen forefathers, decorative road lightening, and granite covered transitions on the entrance of the bridge. The safety of the bridge is provided via the barrier embedded in the surface and controlled from the control hut at the entrance, signaling and signs which control the transmission. The bridge is proper for general road architecture of Avaza region. The pavement length of single and two lane ways of 46km road project of Avaza region is 50.235,00 meter. There are 726 stainless steel pillars which are 12 meter, two sided and used in this road project. There are 2055,00 steel pavement lightening pillar at the height of 4 meter. There are 76 bus stations with a modern design. There are 296 sitting bench, wireless image transfer system and 14 cars for road services. 420.000 bush and digger, 275.000 seasonal flower and 11000 tree and small tree were used in the greening work of this project.
Our projects
Our projects