TURKMENISTAN SOLID WASTE SEPERATION & COMPOSITE PLANT
Explanation
Regular storage and solid waste disposal plan founded in Ashgabat was constructed on a 65.000m2 land, 3km away from the west of seventeenth km of Ashgabat-Dasoguz way. In those plants which were projected for 800 tons/ day solid waste: 1. Decomposition plant in the capacity of 50 ton/hour 2. Compost plant in the capacity of 160.000 ton/year 3. Eight cells within regular storage area have been constructed. Solid waste regular storage cell (originally constructed as a 30.000m2 cell) has garbage seepage water storage reservoir, weigh house, administrative house, workshop house, tire washing unit, cesspool tank, water store, medical waste sterilization unit, pumping building and heating center, transformer center plants. In this plant which is established on 18.000m2 closed area, Turkish and German technologies (Eggersmann Anlagenbau GmbH & Co.) have been used.
Our projects
Our projects